Silver Dollar City

Mystic River Falls

  • Water ride
  • Barr Engineering, Swiss Ride Services
  • In operation
Status
In operation
Category
Water ride
Manufacturer
Barr Engineering
Swiss Ride Services
Length
640.00 m
Duration
05:30 min.

Other data

Building costs
23,000,000 €